As this is the final stage of design before construction, many decisions have been made which have been consulted on during earlier phases of the project. This consultation gives you the opportunity to look at detailed design features like the locations of bus stops, beach access points, seating areas, and planting and let us know if you have any thoughts.
View and download the draft design plans.
Consultation closes 5pm 23 November.
Following this stage, feedback on the plans will be incorporated where possible into the full Bay-Specific Urban Design Plans. These will then be submitted to the Eastbourne Community Board, East Harbour Environmental Association, and relevant Residents Associations for feedback, in line with the conditions of consent for the project.